Building and developing a management system

A management system should organise the work, not create extra work. In practice it is often put together under time pressure shortly before certification. The result passes the audit and is barely touched again afterwards.

A system that carries weight and brings benefit looks different. It describes how the work is actually done, and it can be maintained without taking someone off their job to do it. Whether ISO 9001, ISO 14001, ISO 45001, ISO 13485 or a sector standard: the build follows the same logic in every case.

Three ways in

Implementation

From the first idea through roll-out to certification and beyond. We first establish where you stand and what the standard really requires of your organisation. The documentation then grows step by step, tailored to your processes.

Optimisation

For organisations that already have a system and are not getting anywhere with developing it further. Process and gap analyses show where actions make sense and where they are necessary. You get an outside view of routines that nobody inside questions any more.

Further development

Another standard, new compliance obligations, additional customer requirements. Extensions like these should be planned, not left to grow by themselves. We integrate them so that the effectiveness of the existing system is preserved.

Wherever you come in, three things stay the same in every project.

Lean rather than overloaded. Anyone building a system for the first time documents far too much, in our experience. That passes the audit and then costs you years of upkeep. Every additional document has to be controlled, trained and updated with every change. So we document first what you already do. We add only where the standard requires more.

Integrated rather than side by side. Context, leadership, competence, document control, internal audits and management review are near-identical in almost every management system standard. Separate systems mean maintaining and auditing the same processes twice. From the outset we build a shared base structure with the future in mind, so that further management system standards can be integrated later without changing that structure. The standard-specific parts are built in systematically instead of standing beside it.

The system comes from the people who work with it. Processes written at a desk are not lived. They describe a way of working that never existed on the shop floor. So we develop processes together with the people involved, at their workplace. Recording them takes a little longer, and it saves every later discussion about whether the requirement is workable.

Who this is for

What you get

How we work

  1. Taking stock

    A gap analysis shows what you already meet and what is missing. There is often more in place than expected, just not recognisable as evidence. That saves effort at exactly the point where things otherwise get written from scratch.

  2. Objective and schedule

    We fix the scope, the standards and the target date. From that comes a plan with work packages, responsibilities and deadlines. You can see from the start when and from whom time will be needed in your company.

  3. Recording the processes

    Conversations in the departments, observation on site, comparison with the requirements. We record how the work is done and change only where the standard or common sense call for it.

  4. Documentation and roll-out

    Requirements are drafted, agreed and approved. Plus training for those affected and a look at whether the rule works in day-to-day practice. Actions without a check on effectiveness are only statements of intent.

  5. Ready for certification

    Internal audit, management review, preparation for stage 1 and stage 2 of the external certification audit. On request we accompany you through the certification audit and afterwards onwards through the surveillance cycle.

Who handles this at our end

Marion Rammé – IRCA certified and registered QMS / EMS / OHSMS Lead Auditor #01194927

Rüdiger Rammé – IRCA certified and registered QMS / OHSMS Lead Auditor #01192806

If we have built your system, a different person from our team carries out the internal audit. Nobody audits their own work. That is how we ensure the necessary independence and a clear view of your management system. Who can step in for which standard is set out in the competence matrix.

The team in detail

How this looked in practice

Starting point: A distributor of highly specialised laboratory products, around twenty employees at one site, part of a European group. The trigger came from outside: customers required a certified management system from their supplier. An organisation chart, a set of objectives and complaint statistics were in place. What was missing was a company policy, documented processes and any form of risk assessment.

Approach: Two gap analyses, the first remote covering context, interested parties and scope, the second on site covering the operational flow from goods receipt to dispatch. We assessed 18 requirement blocks along clauses 4 to 10 of the standard. From that came a scheduled implementation plan with traffic-light logic that sets out what the client handles and where we assist. At their express request, the outcome is process descriptions rather than a manual, in a lean format without the usual mandatory fields.

Result: Not one of the 18 requirement blocks was free of findings. But in 10 of the 18, the substance was already there and only the systematic approach was missing. That distinction is what determines the effort: where work is being done but not documented, the path is short. From the first meeting to the planned certification audit is around nine months.

The client's name and sector details remain confidential.

Frequently asked questions

What does it cost to build a management system?

A build project typically comes in between 10,000 and 50,000 euros. The drivers are size and number of sites, the maturity of your processes, and how much you take on yourselves. The certification body charges its fees separately. After a conversation about your scope we can narrow the sum down.

How long does it take to get the certificate?

For an initial certification to one standard, six to twelve months is a realistic frame. The reason is not the workload but the time: the standard requires evidence covering a certain period, plus an internal audit and a management review. That history cannot be shortened.

How much work does this create for us internally?

Most of it while the processes are being recorded, because that is where your staff are needed. Reckon on a few hours per department, spread over several appointments. Management needs time for context, objectives and review. Drafting, agreeing and wording the documents is on us.

Should we build an integrated system or separate ones?

In almost every case, an integrated one. The shared requirements of the management system standards make up a large part of each individual standard. Run separately, you maintain and audit the same topics several times over and usually face a control problem, because identical requirements have to be checked at different points in the systems. Separate systems only make sense where the scopes genuinely have nothing to do with each other in organisational terms.

Can an existing system be slimmed down again?

Yes, and it is a frequent assignment. We check document by document whether it is required by the standard, needed for the process, or simply habit. The third group is usually the largest. What remains is merged, the rest is withdrawn in an orderly way.

Do you then certify us as well?

No, we are not allowed to. Certification is carried out solely by an accredited certification body. We build the system, prepare you and support you through the procedure. The certificate is issued by someone else, and that is how it should be, so that the independence of certification is preserved.

Let us talk about it

The first conversation is free and without obligation. It usually takes half an hour. Afterwards you know what to expect.

Prefer to write? The contact form reaches us just as well.